Offshore Dismantling System

mattress clamp image hero

Bringing the conduct to light

The first intervention concerns the discovery of the pipes to be removed, which are located beneath the concrete mattresses. This is where the dedicated clamp comes into play: the mattresses are removed and moved with precision, allowing the pipes to be uncovered and made accessible again.

mattress clamp
reached the pressure point

First it is emptied, then sealed

Once identified and made accessible, the pipelines are flushed to remove the hydrocarbon residues inside them, ensuring the safety of the lines before subsequent operations.

After the flushing has been completed, the pipes are isolated with high-pressure plugs that seal the ends tightly, preventing any further leakage during the disposal phases.

cap
cut-outs

The cut that frees the structure

At this point, the pipe cutting machine comes into play, which cuts the pipes with precision, separating them from the rest of the system and preserving the integrity of the adjacent sections.

Once the cutting and securing operations are complete, the platform can be removed, leaving the pipelines abandoned and properly isolated on the seabed.

Offshore Dismantling System

Bringing the conduct to light

The first intervention concerns the discovery of the pipes to be removed, which are located beneath the concrete mattresses. This is where the dedicated clamp comes into play: the mattresses are removed and moved with precision, allowing the pipes to be uncovered and made accessible again.

mattress clamp
First it is emptied, then sealed

Once identified and made accessible, the pipelines are flushed to remove the hydrocarbon residues inside them, ensuring the safety of the lines before subsequent operations.

reached the pressure point

After the flushing has been completed, the pipes are isolated with high-pressure plugs that seal the ends tightly, preventing any further leakage during the disposal phases.

cap
The cut that frees the structure

At this point, the pipe cutting machine comes into play, which cuts the pipes with precision, separating them from the rest of the system and preserving the integrity of the adjacent sections.

Once the cutting and securing operations are complete, the platform can be removed, leaving the pipelines abandoned and properly isolated on the seabed.

cut-outs